OCCUPATIONAL SAFETY
JCOSHA Annual Audit
Japan Construction Occupational Safety and Health Association audits every active Kenchan project annually. The 0.00 TRIR record across 38 consecutive projects (2017–2024) is drawn from these audit reports.
SAFETY & QUALITY / DOCUMENTATION
Between 2017 and 2024, Kenchan Construction Group completed 38 heavy civil contracts without a single lost-time injury. The record is audited annually by the Japan Construction Occupational Safety and Health Association and forms the baseline of every project safety plan we submit with an RFQ.
§ 02 — THIRD-PARTY VERIFICATION
Procurement evaluators can cross-check every safety, quality, and financial credential against a named registrar. No self-attestation.
OCCUPATIONAL SAFETY
Japan Construction Occupational Safety and Health Association audits every active Kenchan project annually. The 0.00 TRIR record across 38 consecutive projects (2017–2024) is drawn from these audit reports.
QUALITY MANAGEMENT
Certified since 2004. Covers earthworks, structural steel erection, concrete placement, pile foundations, and project management — the 92% of work scope Kenchan self-performs.
ENVIRONMENTAL MANAGEMENT
Certified since 2011. Underwrites the SBTi-aligned roadmap to a 42% Scope 1+2 emissions reduction by FY2030 versus the FY2019 baseline.
FINANCIAL STRENGTH
Japan Credit Rating Agency, Ltd. reaffirmed an A− rating in March 2024. Audited financial statements available for the past 38 years across 1,200+ completed contracts with zero bond claims.
§ 03 — METHODOLOGY
In 2019, the Hokkaido Branch of the Japan Civil Engineering Contractors' Association formally adopted a cold-weather concrete pouring protocol co-developed and field-proven by Kenchan. It is the document that makes a January bridge-deck pour possible in Otaru.
Hydration heat curves are modeled against the 7-day Hokkaido forecast for the pour footprint. Mix design, cement content, and accelerator dosage are tuned to maintain a core temperature >5°C for the first 72 hours.
Sand and coarse aggregate are pre-heated in the Otaru batch plant before transit. Incoming concrete temperature at the placement face is documented in real time and rejected below the 10°C threshold.
Forms are wrapped in insulated tarpaulins with monitored forced-air heat. Internal concrete temperature and ambient differential are logged at 30-minute intervals for the first 168 hours.
Field-cured cylinders and maturity-meter readings must reach the specified compressive strength before formstripping. Stripping decisions are signed off by a licensed 1-kyu construction engineer, not the foreman.
OUTCOME — sub-zero pours delivered on critical path, with the field-cure strength record preserved in the as-built documentation handed to the client at handover.
§ 04 — RECURRING SAFETY CYCLE
A zero-incident record is not a streak. It is the output of a four-stage cadence repeated on every project, every day, every year.
Project-specific risk assessment, method statements, and lift studies prepared by the in-house engineering team before a machine leaves the yard.
Owner: Engineering Manager
Every worker and visitor receives a documented site induction before stepping on the workface. Toolbox talks run at 07:00 every working day.
Owner: Site Safety Officer
External auditors from JCOSHA inspect every active project once per year. Findings, corrective actions, and close-out dates are logged in the project file.
Owner: Third-party (JCOSHA)
Kenchan's executive committee reviews lagging indicators (TRIR, near-miss reports, audit findings) and leading indicators (training hours, observation cards) once per quarter.
Owner: President / Executive Committee
§ 05 — PRE-QUALIFICATION METRICS
0.00TRIR
Total Recordable Incident Rate, 38 consecutive civil works projects (2017–2024). JCOSHA-audited.
38PROJECTS
Consecutive heavy civil and industrial contracts completed without a lost-time injury.
96% RETENTION
Year-over-year field crew retention. Average employee tenure across the workforce: 14.6 years.
1,217CONTRACTS
Completed construction contracts since incorporation. Cumulative contract value exceeding ¥84 billion.
§ 06 — PRE-RFQ DUE DILIGENCE
If your evaluator's question is not here, send it to [email protected]. We respond inside one working day.
No. The publicly disclosable safety record covering 2014 through 2024 shows zero fatalities and zero life-altering incidents. The 0.00 TRIR (Total Recordable Incident Rate) covers the 38 consecutive civil works projects delivered between 2017 and 2024 and is the figure referenced in our pre-qualification submissions.
Yes. Audit reports are released to the client or to a nominated third-party evaluator under NDA at the RFQ stage. Redacted summaries citing the auditor, the project, and the close-out date can be provided without NDA during the pre-qualification exchange.
Kenchan carries contractors' all-risk (CAR) and third-party liability insurance with limits scaled to the contract value, plus statutory workers' compensation cover under Japanese labour law. Specific limits, named insurers, and certificates of currency are released with the tender documents.
No. Kenchan does not mobilize outside Hokkaido, Aomori, and northern Tohoku. The Otaru batch plant, the quarry, the 142-machine fleet, and the 312-person workforce are configured around this operating footprint. RFQs outside that geography are returned with a referral to a partner contractor.
Kenchan self-performs 92% of the work scope — earthworks, structural steel erection, concrete placement, and pile foundations. Sub-tier engagement is limited to specialist trades outside that envelope (e.g. specialist cathodic protection, niche instrumentation). The full sub-tier register and pre-qualification status of each named sub-tier is provided with the tender.
Ready to open an RFQ conversation? Send the project brief and we will return a documented response.
Request a Project Consultation